2-7-2-zamena-zadnego-salnika-kolenchatogo-vala.html
2.7.2. Replacement of a back epiploon of a bent shaftRemoval
Remove a flywheel.
Remove a plastic ring the screw-driver.
Removal of a plastic ring: 1 – plastic ring; 2 – screw-driver
NOTE
Make openings in the areas shown in the drawing in provisions: 5 h and 7 h as it is the only areas where behind a sealing ring there are cavities.
|
Use the suitable tool, like a pricker to make an opening in a sealing ring
Places for making of openings: 1 – places for openings; 2 – suitable tool
NOTE
Diameter of an opening should not be more than 2 mm. Otherwise, the bolt of KM adaptation 6624 will not be able to hold a ring.
|
Place a pricker on an outer edge of a sealing ring.
Remove a sealing ring.
Fix the KM special tool 6624 on a sealing ring.
Tighten a bolt.
Removal of an epiploon: 1 – KM special tool 6624; 2 – special KM-328-B tools and KM 6624
Attach the special KM-328-B tool to KM 6624.
Remove a sealing ring by means of the special KM-328-B tools and KM 6624.
Installation
Remove the sealant remains from connection of the block of cylinders with the oil pallet (shooters in the drawing).
Establish a new sealing ring
Shift a sealing ring on a bent shaft. Shift before full and uniform landing in the block of cylinders.
NOTE
Do not press a sealing ring completely.
|
Establish a sealing ring by means of the KM special tool 6623.
Installation of an epiploon: 1 – KM special tool 6623; 2 – the fixing bolts; 2 – fastening bolt
Tighten 3 bolts for fixing.
Completely press a sealing ring.
Wrap a fastening bolt.
Remove the KM special tool 6623
Turn off 3 bolts for fixing.
Establish a flywheel.
|